Design Workshop 3

On October 22, the third design workshop was held. Marcel and Sarah presented a flushed out version of the vision for Potrero Gateway Park and The Loop.

The next step will be meetings to review these plans with Caltrans, DPW, and San Francisco Parks Alliance and then get both phase and cost estimates for fundraising.

The meeting was held at the Russian Gospel Church and was attended by over 40 neighbors.

Workshop 3

Loop

17th Street

 

San Bruno

 

Design Workshop 2

The second Design Workshop conducted by Marcel Wilson and Sarah Moos of Bionic was held at the Russian Gospel Church on August 22, 2013 at 7pm. Community members, Jerad Weiner from DPW, Steve Schweigerdt from SF Parks Alliance and Rachel Carpenter from SFMTA contributed to the meeting.

Alternatives were presented for three of the eight identified zones.

The most comprehensive option for 17th Street is the program option:Beneath the Freeway

Option 1 for the Vermont Street right-of-way includes stairs to a view